|
|
The County is planning to construct all four lanes of this roadway from MD 5 westward across the county to MD 210. This will allow for traffic to cross the entire county from east to west to the south of Waldorf, and connect the Bryans Road area to Waldorf. Signs are posted in Highgrove at the point where the new roadway will intersect Highgrove Drive within the neighborhood. This project has several phases. Approval for Phases 5, 6, and 7 will occur at the same time.
Photographs from the July 31 2008 hearing about the CCC, including photos of the provided maps and engineering drawings, can be found here: For more information about the Cross County Connector:
A diagram of Highgrove can be found with the link below. This comes from the 'preliminary plan' for our neighborhood. You can see the alignment of the Cross-County-Connector in the middle of the page. Note: These are large JPG file. You may want to save them to your local PC before trying to open or print them.
|